Brackets installed. Support post removed and....VIOLA!....still standing.
"God Does Not Deduct from Man’s Allotted Time Those Hours Spent Riding a Motorcycle"
Sunday, April 8, 2012
Wednesday, March 14, 2012
Our dumpster runneth over!
HOORAY the dumpster is leaving today which means we are finished tearing stuff out! (well, until we start outside...).
Appliances
I decided to buy a used built-in refrigerator and range (because I can't justify the price of new ones and they are really more for show because I typically only cook for two!
I just bought this 48" Jenn-Air fridge. Supposedly it's 3 years old, everything works and it was taken out of a house that is being remodeled and replaced with a Subzero. I can't confirm any of this because we just took it off the trailer and haven't even plugged it in yet.....but Gerald who posted it on Craigslist and drives a Cadillac and had it in a storage unit in Arlington had a very believable story, so we took a gamble.
It does have a dent on the refrigerator door but otherwise looks great inside and out. We can get a new 'skin' for the door. It's about an $8,000 refrigerator and we paid $1,600.
I'll let you know how this turns out!
I just bought this 48" Jenn-Air fridge. Supposedly it's 3 years old, everything works and it was taken out of a house that is being remodeled and replaced with a Subzero. I can't confirm any of this because we just took it off the trailer and haven't even plugged it in yet.....but Gerald who posted it on Craigslist and drives a Cadillac and had it in a storage unit in Arlington had a very believable story, so we took a gamble.
It does have a dent on the refrigerator door but otherwise looks great inside and out. We can get a new 'skin' for the door. It's about an $8,000 refrigerator and we paid $1,600.
I'll let you know how this turns out!
A little problem...
We could feel a little hump in the master bedroom floor and once we removed the carpet Tim confirmed the cause. The bedroom floor joists extend to support the small outside deck and over time they have warped (or pulled down) causing the end that's under the bedroom floor to push up the floor board. (I'm sure I used all the wrong terminology.)
Tim says we will have to remove the deck. Remove the inside floor boards and put in new joists and rebuild the deck.
Tim says we will have to remove the deck. Remove the inside floor boards and put in new joists and rebuild the deck.
Dust Everywhere!
There was some dust when Tim chipped up all the tile. Then the next weekend we had to rent the demolition hammer again with a different chisel to remove the mastic so we have smooth concrete for new tile. I tried it first but the tool was too heavy for me. Tim spent a full day but it looks great now! Talk about dirty...there was so much dust it looked more like smoke.
Kitchen Area
The kitchen is a nice size and the layout is going to be similar to what we tore out. We are going to move the refrigerator to another wall to make room for a larger range. We removed the peninsula island and will have a center island instead.
On the other side of the kitchen area was a half bath that opened right into the kitchen and a crazy little pantry closet with tiny shelves (I don't know what they were thinking). Also in this area was the washer/dryer that you had to access from the garage and the water heater.
My dad will appreciate this: Tim removed the water heater and drained it. It was big and old, I think Tim said 80 gallon. Anyway he wanted to put it in the dumpster. By this time the dumpster was so full that we could no longer open the door because stuff would fall out. After several failed attempts he and I finally picked it up high enough to push it up and over the edge of the dumpster. It was brutal!
We are moving the washer/dryer to the 2nd floor and replacing the water heater with a tankless one which opened up a lot of room. Now this area will have a built-in refrigerator, a pantry cabinet under the stairs and a small hall to the bathroom.
On the other side of the kitchen area was a half bath that opened right into the kitchen and a crazy little pantry closet with tiny shelves (I don't know what they were thinking). Also in this area was the washer/dryer that you had to access from the garage and the water heater.
My dad will appreciate this: Tim removed the water heater and drained it. It was big and old, I think Tim said 80 gallon. Anyway he wanted to put it in the dumpster. By this time the dumpster was so full that we could no longer open the door because stuff would fall out. After several failed attempts he and I finally picked it up high enough to push it up and over the edge of the dumpster. It was brutal!
We are moving the washer/dryer to the 2nd floor and replacing the water heater with a tankless one which opened up a lot of room. Now this area will have a built-in refrigerator, a pantry cabinet under the stairs and a small hall to the bathroom.
Subscribe to:
Posts (Atom)